Plan with the property, not assumptions.
Service-entrance rated or downstream
Some projects require a transfer switch rated for use at the service entrance; others use a downstream arrangement serving a selected panel. The selected configuration must match the utility and the electrical design.
Circuit and load management
Connected heating, cooling, water-heating and other large electrical loads may need prioritization or managed operation. A transfer switch rating does not mean a generator has enough output for every appliance.
Panel and wiring scope
Projects may include meter-main coordination, subpanel modifications, new conductors, disconnects and inspection work. We document where the transfer equipment will be located and how existing circuits will be affected.
Start-up and commissioning
A completed scope should identify commissioning, safe transfer operation and the owner’s operating instructions, along with any maintenance requirements.
From first discussion to a defined scope
- 01Inspect existing service and the equipment ratings
- 02Identify the intended backed-up loads and transfer method
- 03Confirm utility requirements and permit scope
- 04Install, test and explain operation as contracted
Common questions
Does a 200-amp transfer switch require a 200-amp generator?
No. Transfer equipment amperage and generator output are different design considerations. Connected loads must still fall within the generator and system capabilities.
Can an automatic transfer switch go in a garage?
Sometimes, subject to the equipment listing, working clearances, routing, service layout and applicable local requirements.
Is load shedding always required?
Not always. It depends on available generator capacity, connected loads and the system arrangement.
Clear recommendations begin with a real assessment.
Our written scope identifies applicable equipment, permits, testing, exclusions and project conditions before you approve work.