Automatic transfer switches: the part of backup power that must be planned correctly.

A transfer switch separates the normal utility source from the generator supply and routes power to the intended electrical loads. Its selection and installation need to match the actual service equipment, panel arrangement and approved generator system.

01 / WHAT MATTERS

Plan with the property, not assumptions.

01

Service-entrance rated or downstream

Some projects require a transfer switch rated for use at the service entrance; others use a downstream arrangement serving a selected panel. The selected configuration must match the utility and the electrical design.

02

Circuit and load management

Connected heating, cooling, water-heating and other large electrical loads may need prioritization or managed operation. A transfer switch rating does not mean a generator has enough output for every appliance.

03

Panel and wiring scope

Projects may include meter-main coordination, subpanel modifications, new conductors, disconnects and inspection work. We document where the transfer equipment will be located and how existing circuits will be affected.

04

Start-up and commissioning

A completed scope should identify commissioning, safe transfer operation and the owner’s operating instructions, along with any maintenance requirements.

02 / PROJECT PROCESS

From first discussion to a defined scope

  1. 01Inspect existing service and the equipment ratings
  2. 02Identify the intended backed-up loads and transfer method
  3. 03Confirm utility requirements and permit scope
  4. 04Install, test and explain operation as contracted
03 / HELPFUL ANSWERS

Common questions

Does a 200-amp transfer switch require a 200-amp generator?

No. Transfer equipment amperage and generator output are different design considerations. Connected loads must still fall within the generator and system capabilities.

Can an automatic transfer switch go in a garage?

Sometimes, subject to the equipment listing, working clearances, routing, service layout and applicable local requirements.

Is load shedding always required?

Not always. It depends on available generator capacity, connected loads and the system arrangement.

TALK WITH MBHCE

Clear recommendations begin with a real assessment.

Our written scope identifies applicable equipment, permits, testing, exclusions and project conditions before you approve work.