Plan with the property, not assumptions.
Whole-home versus essential-circuit backup
Whole-home coverage and essential-load backup have different equipment, transfer and load-management requirements. We review your actual priorities—refrigeration, lighting, internet, heating equipment, pumps and other loads—before recommending a design.
Fuel, placement and site constraints
Natural gas or propane supply and generator placement require separate reviews of capacity, clearances, site access, local rules, noise and maintenance access. Generator sizing alone does not settle those questions.
Electrical service and transfer equipment
The design must account for the existing panel, service rating, utility interconnection, suitable transfer switch and whether load shedding or panel modifications are needed. All work is scoped for permitted installation where required.
Options and project scope
A clear proposal distinguishes generator equipment, transfer switch, gas plumbing by the responsible contractor, electrical feeders, pads, commissioning, permits, any trenching and ongoing maintenance. The quote should not imply that all site work is included.
From first discussion to a defined scope
- 01Tell us what must remain powered during an outage
- 02Review the service, panel, gas/propane supply and site placement
- 03Determine equipment and transfer-switch options from a documented load assessment
- 04Finalize permits, exclusions and installation responsibilities in writing
Common questions
What size generator do I need?
The answer comes from the specific equipment and circuits you want supported, motor starting loads and whether load management is used. A home’s square footage alone is not an adequate sizing method.
Will a standby generator power everything in my house?
Only if the installed system and available fuel supply are designed for those connected loads. Some installations prioritize essential circuits or manage larger loads automatically.
Do I need a transfer switch?
A proper utility isolation and transfer method is essential. The correct listed equipment and connection design depend on the installation.
Can you also review my electrical panel?
Yes. MBHCE holds the California C-10 electrical classification and can evaluate the panel and service work needed for a proposed generator installation.
Clear recommendations begin with a real assessment.
Our written scope identifies applicable equipment, permits, testing, exclusions and project conditions before you approve work.